logo
Goede prijs  Online

details van de producten

Huis > Producten >
Getande Finned Buis
>
ASME SA213 TP304H Serrated Finned Tube with SS304 Fins For HRSGs and Boilers

ASME SA213 TP304H Serrated Finned Tube with SS304 Fins For HRSGs and Boilers

Merknaam: YUHONG
Modelnummer: ASME SA213 TP304H gekartelde ribbenbuis
MOQ: 200 ~ 500 kg
Prijs: Onderhandelbaar
Verpakking: Ply-houtkisten met stalen frames en pijpbezit beide uiteinden met plastic doppen
Betalingsvoorwaarden: TT, LC
Detailinformatie
Plaats van herkomst:
China
Certificering:
ABS, BV, DNV, CCS, LR
Productnaam:
HFW getande ribbenbuis/U-gesneden ribbenbuis
Basisbuisspecificatie en materiaal:
ASME SA213TP304H
Vinmateriaal:
SS304H
Vinhoogte:
5 tot 30 mm
Vindikte:
0.8~3 mm
Applicatie:
Kessel/luchtgekoelde condensator/warmtewisselaar
Vin -pitch:
3~25 mm
Basisbuis OD:
16~219 mm
Sollicitatie:
HRSG's en ketels
Levering vermogen:
Volgens de vereisten van klanten
Markeren:

ASME SA213 TP304H serrated finned tube

,

SS304 fins boiler tube

,

serrated finned tube for HRSGs

Productomschrijving
ASME SA213 TP304H Serrated Finned Tube with SS304 Fins For HRSGs and Boilers An ASME SA213 TP304H Serrated Finned Tube with SS304 Fins is a premium, high-efficiency component critical for the performance and reliability of modern industrial boilers and heat recovery systems. Here are some detailed breakdowns: 1. Base Tube: ASME SA213 TP304H seamless tubes (1). Chemical Composition (Weight %) The composition is defined in the ASME SA-213 specification. The following are the
Beoordelingen en recensie

Algemene Beoordeling

4.0
Gebaseerd op 50 beoordelingen voor deze leverancier

Beoordelingsmomentopname

Het volgende is de verdeling van alle beoordelingen
5 sterren
0%
4 sterren
100%
3 sterren
0%
2 sterren
0%
1 sterren
0%

Alle recensies

A
Ahmed Al-Rashid
Kuwait Mar 3.2026
Tube ends were clean, dimensions consistent. Our crew didn't run into fit-up issues.
P
P*l
India Sep 16.2025
No leaks, no fin damage, performance consistent. Heat transfer hasn't dropped, so fouling doesn't seem to be a problem yet.
G
Godfrey
Uganda Aug 20.2025
For power plant boilers, especially in industrial settings like ours, these tubes work. Good heat transfer, holding up well.